What we did
First we removed the old kitchen and remove all tiles. Next we demolished the walls separating the two kitchen areas and repaired any damage.
Next stage was to apply plaster to all walls and ceilings and then upgrade the wiring in the kitchen area. We adjusted the pipes as needed and encased them where necessary. Next we integrated the French doors, resizing the opening to match the adjacent window and then we installed two additional windows.
We relocated the boiler and set up a new radiator and then assembled the kitchen according to the Wren design. We arranged for Stones4life to install the recommended countertops.
Finally we tiled the floor and the area above the countertops and finished by painting all walls, ceilings, and woodwork.
Before renovation
Leave A Comment